3.10.1Description
p. p. 45
3.10.1Description The plan and details of Option P-3 are shown on Drawing SK-009. This option consists of infilling the entire tidal pond area to the level of the tree line (top of existing berm, approximate El. 6.0 ft) and sloping it to d...
AI summary Option P-3 involves infilling a tidal pond to the tree line level, creating a treed floodplain and altering drainage patterns. This would eliminate wetland functions, increase attraction flow near an existing fishway, and result in occasional flooding. The watercourse channel would remain along the north side of the tidal pond.