Matter: Nova Scotia Power Inc. - CI C0064966 – Tusket Tidal Pool Fish Passage - $1,763,971
1 passage 1 document

Non Energy Impacts across all matters →

N-1Work Order - Redacted 1 passage
3.10.1Description p. p. 45
3.10.1Description The plan and details of Option P-3 are shown on Drawing SK-009. This option consists of infilling the entire tidal pond area to the level of the tree line (top of existing berm, approximate El. 6.0 ft) and sloping it to d...

AI summary Option P-3 involves infilling a tidal pond to the tree line level, creating a treed floodplain and altering drainage patterns. This would eliminate wetland functions, increase attraction flow near an existing fishway, and result in occasional flooding. The watercourse channel would remain along the north side of the tidal pond.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →