W-1Report - Redacted
1 passage
August 27, 2026 Crystal Henwood Clerk of the Board Nova Scotia Energy Board 1601 Lower Water Street, 3rd Floor P.O. Box 1692, Unit "M" Halifax, NS B3J 3S3 RE: M12870 – Wasoqonatl Transmission Incorporated – Q2 2026 Independent Engineer Rep...
AI summary The Nova Scotia Energy Board (NSEB) has approved the submission of quarterly Independent Engineer Reports for the NS-NB Reliability Intertie Project, following a request by Wasoqonatl Transmission Incorporated (WTI). This follows a prior decision requiring such reports to be filed with the Board.
103405Board letter re: accepted as filed
1 passage
September 2, 2026 [[email protected]](mailto:[email protected]) Mary Ellen Greenough Director, Legal and Regulatory, ECEI Projects Nova Scotia Power Inc. PO Box 910 Halifax, NS B3J 2W5 Dear Ms. Greenough: M13059 –...
AI summary Nova Scotia Power Inc. submitted a quarterly report from BTY Consultancy Group Inc., the independent engineer for the NS-NB Reliability Intertie Project, which concluded the project can be completed within budget and before the deadline. The report was filed in response to a directive from the Nova Scotia Energy Board due to the involvement of the Canada Infrastructure Bank.
Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →