W-1Report - Redacted 1 passage
Preamble
August 27, 2026 Crystal Henwood Clerk of the Board Nova Scotia Energy Board 1601 Lower Water Street, 3rd Floor P.O. Box 1692, Unit "M" Halifax, NS B3J 3S3 RE: M12870 – Wasoqonatl Transmission Incorporated – Q2 2026 Independent Engineer Rep...

AI summary The Nova Scotia Energy Board (NSEB) has approved the submission of quarterly Independent Engineer Reports for the NS-NB Reliability Intertie Project, following a request by Wasoqonatl Transmission Incorporated (WTI). This follows a prior decision requiring such reports to be filed with the Board.

103405Board letter re: accepted as filed 1 passage
Section 1
September 2, 2026 [[email protected]](mailto:[email protected]) Mary Ellen Greenough Director, Legal and Regulatory, ECEI Projects Nova Scotia Power Inc. PO Box 910 Halifax, NS B3J 2W5 Dear Ms. Greenough: M13059 –...

AI summary Nova Scotia Power Inc. submitted a quarterly report from BTY Consultancy Group Inc., the independent engineer for the NS-NB Reliability Intertie Project, which concluded the project can be completed within budget and before the deadline. The report was filed in response to a directive from the Nova Scotia Energy Board due to the involvement of the Canada Infrastructure Bank.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →