Topic:"Planned Outage" in M03506

Matter: CI# 38942 - P-128.10 - NSPI WO - TUC-Unit #3 Generator Rotor Rewind - $1,798,080
1 passage 1 document

Planned Outage across all matters →

N-1Redacted Work Order 9/2/2010 1 passage
Section 30 p. p. 1
TUC #3 GENERATOR ROTOR REWIND Project Number Approved Date Parent CI Number Cost Centre 319 319-TC Unit 3 Capital Capital Item Justification Justification Criteria: THERMAL Sub-Criteria: Maintenance Name of Report : Document Location : Per...

AI summary The TUC #3 Generator Rotor Rewind project is being undertaken to replace insulating barriers and prevent an extended unplanned outage. The project was identified during a 2009 inspection and is being carried out now due to the availability of lower costs from rotor service shops. The project is being done through a full rotor rewind rather than replacing the generator due to cost considerations.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →