Matter: Nova Scotia Power Inc. - CI C0082195 – LIN2 2025/26 Capacity Requirement - $4,392,251
2 passages 2 documents

Planned Outage across all matters →

N-1CI C0082195 – LIN2 2025/26 Capacity Requirement - $4,392,251 1 passage
Why do this project? p. p. 2
Why do this project? This project was completed to allow Lingan Unit 2 to operate safely through 2025 and early 2026. Lingan Unit 2 is required to meet the demands of the NS Power system per the 2025 10-Year System Outlook (10YSO), which c...

AI summary This project ensures Lingan Unit 2 can operate safely through 2025 and early 2026. The unit is kept in cold reserve to maintain reliable supply for firm customer load, as outlined in the 2025 10-Year System Outlook. It will remain in reserve until new firm fast-acting generation resources are online and reliable.

N-2NSPI (NSEB) RIRs 1-7 - Redacted 1 passage
NON-CONFIDENTIAL p. p. 4
NON-CONFIDENTIAL 3 The scope of work completed during the outage was concentrated on the principal risk 1 2 4 areas identified through this process, including boiler pressure parts, coal and ash handling 5 systems, electrical and control e...

AI summary The text discusses the scope of work completed during an outage at Lingan Unit 2, focusing on refurbishing or replacing critical systems such as boiler pressure parts, electrical equipment, and valves based on condition assessments and testing results to ensure safe and reliable operation.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →