N-1Redacted Application 6/28/2010 3 passages
CONTRACT (013-028) TENDER p. p. 11
CONTRACT (013-028) TENDER CARLTON DAM UNITS UNIT$ TOTAL Cofferdam 1 LS $ $ Surface Preparation 6000 SF $ $ Grouting 200 FT $ $ Demolition 1 LS $ $ Impervious 25000 CY $ $ Granular Filter Material 3000 CY $ $ Rip-Rap Bedding/Erosion Protect...

AI summary The document outlines a contract (013-028) for the construction of the Carlton Dam, detailing various components such as cofferdam, surface preparation, grouting, demolition, and materials like rip-rap, gravel, and concrete, along with associated costs and quantities.

Preamble p. pp. 11-14
October 9, 2008 Nova Scotla Power Inc. 25 Lakeside Drive Lakeside Industrial Park Hallfax, NS B3T 1M9 Dear Re: Conceptual/Detailed Design of Modifications to the Carleton Dam, Tusket Hydro System, NS AMEC is pleased to submit this proposal...

AI summary AMEC submits a proposal to assist Nova Scotia Power Inc. with the conceptual and detailed design, capital cost estimation, and construction support for modifications to the Carleton Dam, part of the Tusket Hydro System. The proposal includes an understanding of project requirements and an estimate of fees and disbursements.

NOVA SCOTIA POWER INC. HYDRO PRODUCTION DAM SAFETY CAPITAL WORKS PRO p. p. 20
NOVA SCOTIA POWER INC. HYDRO PRODUCTION DAM SAFETY CAPITAL WORKS PRO DAM SAFETY CAPITAL WORKS PROGRAM - February 16, 2010 AL WORKS PROGR 1AM - February 16, 2010 Hydro System (HS) Construction Priority Priority Deficiency Structures Flooded...

AI summary The document presents a table related to the Dam Safety Capital Works Program for various hydro systems in Nova Scotia as of February 16, 2010. It includes columns such as 'Construction Priority,' 'Deficiency,' 'Risk,' and 'Amount,' but most fields are empty or incomplete. The table is part of a regulatory proceeding related to dam safety and capital works.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →