Matter: Nova Scotia Power Inc. - CI C0082195 – LIN2 2025/26 Capacity Requirement - $4,392,251
1 passage 1 document

Power Infrastructure across all matters →

N-1CI C0082195 – LIN2 2025/26 Capacity Requirement - $4,392,251 1 passage
Section 13 p. pp. 3-4
The increase of $1,230,048 from the 2026 ACE Plan subsequent submittal estimate of $3,162,203 is primarily due to the project scope being unknown until equipment could be brought offline to open and inspect for condition, and refurbishment...

AI summary The increase in the 2026 ACE Plan estimate is due to unforeseen refurbishment and replacement requirements identified after inspecting equipment at LIN2. Increased utilization of LIN2 has led to higher maintenance needs.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →