PART 1 — THE METER SWAP (JULY 8, 2026)
p. p. 5
PART 1 — THE METER SWAP (JULY 8, 2026) Consistent with the DRO's June 24, 2026 order that NS Power test meter for accuracy, NS Power attended the property on Wednesday, July 8, 2026. The originally scheduled test window was 8:00 AM–12:00 P...
AI summary NS Power conducted a meter swap on July 8, 2026, as ordered by the DRO. The old meter was tested for accuracy at NS Power's own shop, raising concerns about a conflict of interest. The appeal requests an independent test by Measurement Canada and disclosure of results.