Matter: NSPI DRO Appeal - Billing Issues - Brad Neville
1 passage 1 document

Rate Design across all matters →

104019Board Decision (redacted) 1 passage
Section 3
measuring point for electricity entering the property. NS Power is responsible for delivering electricity to the meter and measuring what passes through it. What happens after electricity passes through the meter is determined by the speci...

AI summary NS Power is responsible for delivering electricity to the meter and ensuring it measures accurately. The Board accepts that the meter readings are accurate based on testing, and customers are responsible for how they use electricity inside their homes. The tables summarize the usage data presented before the Board.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →