An Emera Company UARB APPRO VAL SHEET Total $2,716,723 $3,104,448
AI summary The document presents a valuation sheet with total figures of $2,716,723 and $3,104,448, likely related to a regulatory proceeding involving an Emera Company and the Utility and Regulatory Board (UARB).
This offer contemplates that NS Power will provide its own in-water team and on-site labor. Portadam can supply on-site labor and technical assistance at the below rates. a) Portadam in-water crew onsite assistance; standard weekday rate b...
AI summary NS Power will provide its own in-water team and on-site labor, while Portadam can supply on-site labor and technical assistance at specified rates. Additional rates for overtime and travel are available upon request, and trade union or prevailing wage requirements are not included in the quoted rates.
HYDRO PRODUCTION Hydro System (HS) ack River HS Construction Year Priority Deficiency Structures Flooded Inhabitants Downstream Ranking Factor Ranking Amount Comments nck River HS 1 2 444.07 r River HS 1 , kie Brook HS Į į Il River HS 1 ļ...
AI summary The document outlines a table related to hydro production systems, including details such as construction years, priority, deficiencies, and comments. It also includes information on a Dam Safety Capital Works Program from February 16, 2010, and mentions various hydro systems like Fusket HS and reck Cove HS.