Matter: Nova Scotia Power Inc. - CI C0070486 – HYD Lower Great Brook Stoplog Replacement – $3,593,884
8 passages 1 document

Rates And Money across all matters →

N-2NSPI (NSEB) RIR 1 to 3 - Redacted 8 passages
Time and Materials Nova Scotia Power p. p. 57
Time and Materials Nova Scotia Power LABOUR NIGHT SUN мо N TUE WED ) THU FRI SA Т PERSONNEL CLASSIFICATION DESCRIPTION ST RATE OT RATE DT RATE NS PREMIUM ST ОТ DT ST O1 DT ST ОТ DT ST ОТ DT ST ОТ DT ST ОТ DT S ST OT DT TOTAL COST RATA Rope...

AI summary The document presents a detailed time and materials cost breakdown for personnel classified under IRATA Rope Access Level 3 and IRATA Technician for mobilization and on-site activities. It includes rates for standard, overtime, and double-time labor, as well as NS premium and total costs for each activity.

Time and Materials Nova Scotia Power NDT & RAIS p. p. 69
Time and Materials Nova Scotia Power NDT & RAIS NIGHT SUN MON TUE WED THU FRI SAT PERSONNEL CLASSIFICATION DESCRIPTION ST RATE OT RATE DT RATE NS PREMIUM ST ОТ DT ST ОТ DT ST ОТ DT ST ОТ DT ST ОТ DT ST ОТ DT ST ОТ В TOTAL C RATA Rope Acces...

AI summary The document outlines time and materials costs for Nova Scotia Power's NDT & RAIS activities, including personnel classifications, rates, and equipment rentals for the Mersey River - LGB Dam Stoplog Removal project. It includes detailed tables for labour, equipment, consumables, and travel allowances.

Page 2 p. p. 89
Page 2 Additional Rates (as required) DAY SHIFT NIGHT SHIFT Charge Description Units Pricing Units Pricing Operator Straight Time Hourly Hourly Operator OT Premium Hourly Hourly Operator DT Premium Hourly Hourly Rigger/Signaler/Driver Stra...

AI summary The document outlines additional rates for different job roles during day and night shifts, including straight time, overtime premium, and double time premium. Additional notes mention room and board charges if necessary, with travel to accommodations included.

Preamble p. pp. 89-90
The rates quoted in this proposal are for NSPI Milton only and are considered private and confidential. They may not be disclosed or discussed with others without the prior consent of Irving Equipment Limited. Break out pricing is shown fo...

AI summary This proposal outlines the terms and conditions for services provided by Irving Equipment Limited for NSPI Milton, including pricing, working hours, mobilization, and site requirements. The proposal is confidential and subject to change based on technical details and client responsibilities.

2)Price and Payment – p. p. 90
2)Price and Payment – - A) The price governing the Work shall be as set out in the Contract. Payment terms are net 30 days from date of invoicing for the Work. - B) All other amounts specified in the Contract to be payable by the Customer...

AI summary The document outlines the pricing, payment terms, and conditions related to the Work under the Contract. It specifies payment terms, tax responsibilities, interest charges for late payments, cancellation fees, weather-bound work charges, ground condition responsibilities, contract term, permit requirements, and the Company's right to delay or stop work for safety reasons.

"Schedule B" Budget p. pp. 104-105
"Schedule B" Budget ITEM DESCRIPTION 2025 Monitor Labour – Part-Time September 30 – November 24 (10 hours per day, 7 days a week, with a total of 70 hours, 8 monitors rotating throughout the week in teams of 4, per hour, for 9 weeks) (1 we...

AI summary The document outlines the 'Schedule B' budget for a project involving part-time and full-time monitoring labor, MERCS costs, fuel expenses, accommodations, meals, health and safety training, and equipment. It also notes that NSP may request changes to the work scope or timelines, requiring WFN to amend the quoted schedule accordingly.

Task 4-2: Create an Issued for Review design drawing for NSPI review p. p. 112
Task 4-2: Create an Issued for Review design drawing for NSPI review Based on observations made on site during Wood's initial assessment of the sluiceway, there may be some deviation in the widths of the stoplog openings. The stoplog openi...

AI summary Task 4-2 involves creating an Issued for Review design drawing for NSPI review. It highlights the need to confirm stoplog opening widths on site due to potential deviations observed during initial assessments, and notes that these confirmations are not included in the current proposal and will be discussed with NSPI before work begins.

Table 4-1: Estimate of Hours and Fees by Activity p. p. 121
Selected for Plane 2 24 4 13 16 17 17 8 2 14 18 18 18 19 19 19 19 19 Task 3-1: Develop conceptual-level design alternatives for NSPI review 2 24 32 32 32 24 ļ 2 1 149

AI summary The text presents a table with information related to the development of conceptual-level design alternatives for NSPI review, including hours and fees by activity. The table includes various task numbers and quantities but lacks detailed descriptions of the activities involved.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →