Matter: NSPI DRO Appeal - Meter and Power Consumption - Bernard Wentzell
22 passages 8 documents

Rates And Money across all matters →

W-2Meter Test Letter and Results (redacted) 1 passage
Section 1 p. pp. 0-2
June 25, 2026 Bernard Wentzell Dear Bernard Wentzell, Re: Account No. Meter No. 2291261 We are writing to confirm the results of the recently requested meter test. This test was conducted following your inquiry regarding electrical usage a...

AI summary Nova Scotia Power informed Bernard Wentzell that the meter test conducted at his premises confirmed the meter operates within prescribed accuracy limits. He has the option to request a further test by Measurement Canada within six months at a cost of $55.00, with the fee credited if the meter is found to be inaccurate.

W-3DRO Decision d. June 26, 2026 (redacted) 3 passages
PS
ates you may request the meter be tested by Measurement Canada. The N.S.U.A.R.B. may require you to complete the Measurement Canada test before considering or ruling on your appeal to this decision. The local office of Measurement Canada c...

AI summary The document outlines the process for customers to request a meter test by Measurement Canada in the event of a dispute. It details the steps involved, including the formalization of a written process, shipping the meter for testing, and the subsequent actions based on the results of the test.

Bernard Wentzell
Bernard Wentzell Recall that in my role I investigate N.S.Power's interpretation, and application, of Board approved Regulations. I do not have any jurisdiction over N.S.Power's day-to-day operations. Please comment on the attached, and im...

AI summary Bernard Wentzell is seeking clarification on how N.S. Power interprets and applies Board approved Regulation 3.6. Don Farmer, the Dispute Resolution Officer, responds by confirming that N.S. Power has provided access to account details and explains the billing process related to net and gross generation readings.

Bernard
lease elaborate on what you are disputing. Please copy N.S.Power at the email address above on all future email to me. They will similarly copy you on their email to me related to this matter. Copied Your dispute may be a "consumption disp...

AI summary The dispute centers on a 'consumption dispute' where N.S.Power is responsible for delivering power to the metering point but not for on-premise energy usage. The user disputes a 'power generation' issue and references solar data spreadsheets provided by N.S.Power. Meter accuracy is emphasized as a key factor, with an 'as found' test and potential independent testing by Measurement Canada.

W-4Statement of Account (redacted) 3 passages
Statement of Account / Customer / Premises
Statement of Account / Customer / Premises Acct. BERNARD T WENTZELL Account # Phone no. Bill Date Type Net KWH Billed Demand Energy Charge All Taxes Other Payment Balance 2023/04/27 Elec 2023/03/28 Elec 4,485.00 748.90 37.45 786.35CR 786.3...

AI summary The document provides a detailed account of electricity bills for a customer named Bernard T Wentzell, listing the dates, energy usage, charges, taxes, and payments made over several years. It reflects the billing structure and financial transactions related to electricity consumption.

Statement of Account / Customer / Premises
Statement of Account / Customer / Premises Acct. BERNARD T WENTZELL Account # Bill Date Type 2019/11/26 Elec 520.00 Net KWH Billed Demand Energy Charge 102.80 All Taxes 5.14 Other Payment Balance 107.94 2019/10/28 Elec 114.50CR 2019/09/27...

AI summary This document presents a detailed account statement for Bernard T Wentzell, showing a history of electricity bills, payments, and balances from 2016 to 2019. It includes dates, charges, taxes, credits, and outstanding balances, reflecting the customer's energy usage and financial transactions with Nova Scotia Power.

Statement of Account / Customer / Premises
Statement of Account / Customer / Premises Acct. BERNARD T WENTZELL Account # Bill Date Type 2016/11/25 Elec 2016/10/27 Elec 2016/09/27 Elec 2016/08/25 Elec 2016/07/26 Elec 2016/06/27 Elec 2016/05/26 Elec 2016/04/25 Elec 2016/03/24 Elec 20...

AI summary The document presents a detailed account statement for Bernard T Wentzell, including multiple electricity bills, late charges, taxes, and payments made. It outlines the charges, credits, and balances over a period of time, providing a snapshot of the customer's account activity.

W-5Appellants Billing Information (redacted) 5 passages
Section 1 p. p. 0
3,1,5,2 Nova Scotia Power Inc. PO Box 848, Halifax Nova Scotia B3J 2V7 Any questions? Please call us at 1-800-428-6230 Weekdays 8am-6pm www.nspower.ca Account Number Automatic Withdrawal, Apr 27 $738.61 BERNARD T WENTZELL Service address D...

AI summary This document is a billing statement from Nova Scotia Power Inc. showing the customer's electricity usage and charges for a specific period. It includes details such as the account number, billing dates, energy consumption, and the average daily cost of electricity. The customer is being billed for automatic withdrawal, and there is a note about a billing process update.

Jan 25 3102 p. p. 0
Jan 25 3102 Meter number 2291261 Rate code 03BC2 No. of days 59 New meter read 2221.86 Last meter read 2110.00 Multiplier 40 kWh used 2291261 03BG2 59 1126.43 1106.01 40 817- Your meter was read on Mar 24, 2026

AI summary This document contains a meter reading record for a customer in Nova Scotia, showing details such as meter number, rate code, number of days, and energy usage. The meter was read on March 24, 2026, and the data indicates the amount of electricity used over a specific period.

Section 3 p. pp. 0-1
Billing date Mar 26 Includes payments received by Mar 26 Amount owing from last bill Payment received Feb 26 - Thank you Balance owing after last payment -425.33 $.00 Energy charges: Base Charge $19.17/month Energy 4474 kWh x $0.18187 Ener...

AI summary This document is a billing statement from Nova Scotia Power Inc. for Bernard T Wentzell, showing an outstanding balance of $738.61 due on April 27, 2026. The bill includes energy charges, taxes, and a Provincial Rebate. The payment is being processed automatically, and no late fees are being applied.

N'S POWER INDICATED CONSUMPTION BILLING PERIOD JAN 24H - MAR 24H p. p. 1
N'S POWER INDICATED CONSUMPTION BILLING PERIOD JAN 24H - MAR 24H - C 2010 ter Number Read Date Me eter Read Meter Usage Read Type

AI summary The document provides a billing period summary for Nova Scotia Power, indicating consumption data for the period from January 24th to March 24th. It includes a table with columns for meter number, read date, meter read, and usage.

BILLING RERIUD JAN 24th - MAR 24th p. p. 1
2/21/2026 0:00 1115.82 47.5 14.08 kWh Generation

AI summary The text provides a billing record from January 24th to March 24th, showing a consumption of 1115.82 kWh, with a cost of $47.50 and a rate of $14.08 per kWh for Generation.

W-6NSPI Response to Appeal (redacted) 2 passages
Section 8 p. p. 0
. This difference would also be reflected in the kWh's consumed for the period (reduction in energy required from the grid). It is NS Power's position that the customer has been billed appropriately. NS Power attached the account ledger an...

AI summary NS Power maintains that the customer was billed correctly, supported by meter test results confirming the meter operates within accuracy limits. The DRO's decision, upheld by NS Power, concluded that billing was appropriate under applicable regulations.

Section 9 p. p. 0
6 – Mr. Wentzell appealed the DRO's decision with the NSEB. NS Power agrees with the DRO's decision that Mr. Wentzell has been appropriately billed and compensated for his consumption and generation. As noted in Confidential Attachment 6 ,...

AI summary Mr. Wentzell appealed a DRO decision regarding his billing by NS Power. NS Power agrees with the DRO's decision, stating that Mr. Wentzell was appropriately billed. The data from Solar Edge and NS Power's metering show that Mr. Wentzell's consumption and generation are consistent with previous years, with a net consumption of 4474 kWh and a generation of 817 kWh.

W-8Appellant's Response to NSPI - Redacted 5 passages
Section 1
Forwarded Message From: Bernard Wentzell To: Carley Freeman < [email protected] > Cc: Ross, Jennifer < [email protected] >; Forsey, Lisa < [email protected] >; Murray, Kathleen ; Reiner, Sofia Sent: Tuesday, August 4, 2...

AI summary The sender reports discrepancies between NSP's generation spreadsheets, billing information, and Solar Edge data, indicating potential inaccuracies in NSP's records. The sender provides examples of daily generation numbers that conflict with credited amounts on the bill.

Section 4
Billing date Mar 26 Includes payments received by Mar 26 Amount owing from last bill 425.33 Payment received Feb 26 - Thank you -425.33Balance owing after last payment $.00 Energy charges: Base Charge $19.17/month 38.34 Energy 4474 kWh x $...

AI summary This billing statement shows a customer's energy charges and payments for the period ending March 26. The customer has a balance owing of $738.61, which is due by April 27, 2026. The bill includes base charges, energy usage costs, taxes, and a provincial rebate. The customer is enrolled in the PaySmart Plan, which allows for automatic withdrawals.

N.S POWER INDICATED CONSUMPTION BILLING PERIOD JAN 24th - MAR 24th
N.S POWER INDICATED CONSUMPTION BILLING PERIOD JAN 24th - MAR 24th 2/25/2026 0:00 No AMI Read Available 2/24/2026 0:00 No AMI Read Available 2/23/2026 0:00 2194.144 kWh Consumption 2/22/2026 0:00 2192.143 80.04 kWh Consumption 2/21/2026 0:...

AI summary The document presents a billing period for N.S. Power from January 24th to March 24th, showing consumption data with some dates having no AMI reads available. The data includes kWh consumption values for specific dates, indicating energy usage patterns over the period.

Section 8
N'S POWER METER READ JAN 24A 2108.328 N'S POWER METER READ MAR 24H 2221.865 DIFFERENCE 113.538 X 40 = 4541.48 KW/HRS

AI summary The text provides a meter reading comparison for Nova Scotia Power, showing an increase in energy usage from January to March, resulting in a calculated cost of $4,541.48.

N'S POWER INDICATED CONSUMPTION BILLING PERIOD JAN 244 -MAR 244
N'S POWER INDICATED CONSUMPTION BILLING PERIOD JAN 244 -MAR 244 Read Date Meter Read Meter Usage Read Type 3/27/2026 0:00 2227.599 TO SERVICE THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF THE PROPERTY OF T...

AI summary The document provides a billing period summary for Nova Scotia Power, indicating the meter read date, meter read value, and meter usage for a specific billing period. However, the meter usage data is missing, and there is a repetitive phrase in the 'Read Type' field that appears to be an error.

103437Board (NSPI) - IR-1 to IR-10 1 passage
Request IR-8:
Request IR-8: Please explain, step by step, how NS Power calculated the 4474-kWh consumption and 817-kWh generation credit for the January 24, 2026, to March 24, 2026, billing period, by using the provided metering records on page 3 to pag...

AI summary The document requests an explanation of how NS Power calculated specific energy consumption and generation credits for a billing period using metering records from pages 3 to 6 of Exhibit W-5.

103438Board (Wentzell) IR-1 to IR-3 - Redacted 2 passages
Request IR-1:
Request IR-1: - 2 Please clarify the specific dispute in this appeal. Please explain whether your concern relates to - 3 Nova Scotia Power's (NS Power) generation credits, recorded consumption, meter accuracy, - 4 billing calculations, or...

AI summary The document requests clarification on the specific dispute in an appeal related to Nova Scotia Power's generation credits, recorded consumption, meter accuracy, and billing calculations for the billing period from January 24, 2026, to March 24, 2026.

Request IR-3:
Request IR-3: - Please confirm whether you accept NS Power's meter test results. - a) If no, please explain why, and confirm whether you requested or intended to request an additional meter dispute test through Industry Canada. - b) If an...

AI summary The document requests confirmation on whether NS Power's meter test results are accepted, and if not, whether an additional test was requested or is planned through Industry Canada, along with the provision of test results if available.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →