Home›Rates And Money›M13034›Evidence
Topic/Matter Intersection

Topic:"Rates And Money" in M13034

Matter: NSPI Complaint - Power Pole and Easement Issues - Jefferson Crabtree
15 passages 5 documents

Rates And Money across all matters →

C-2Complainant Update re Scheduled Work (redacted) 1 passage
JOHN W. CH AN D LE R, K.C.
essed by Neil's Auto Service including Jay Neil and Zoe Battis, prior to presenting the matter to any other representative as this matter directly affects the regular operation of Neil's Auto Service. We ask that you provide evidence for y...

AI summary The letter discusses a dispute between Neil's Auto Service and Nova Scotia Power regarding unauthorized work on a property. Nova Scotia Power claims they lacked authorization, but the business owner was informed of this through phone calls. The letter requests evidence for claims of intimidation and asks for clarification on potential consequences.

103607Complainant Response re NSPI Extension Request (redacted) 5 passages
4. The 2023 easement and transaction
4. The 2023 easement and transaction The easement and the 2023 transaction are not the unresolved issue NSP once treated them as. I do not ask the Board to adjudicate every allegation the neighbours have made about the 2023 transaction. NS...

AI summary The 2023 easement and transaction are not unresolved issues as previously thought. The easement was valid and obtained with the consent of the then-current owners. Legal advice confirms its validity, and the easement was addressed before the property purchase closed.

16. Reservation of rights
16. Reservation of rights I am not asking the Board in M13034 to award damages or compensation. I reserve all rights I may have in another forum arising from the delay, additional costs, representations made during the project, or other lo...

AI summary The speaker reserves their rights regarding potential damages or compensation from delays and additional costs related to a project. They advise NSP to complete the installation as soon as possible to mitigate potential losses.

Exhibit 8
Exhibit 8 August 11, 2026 - Rock-breaking correspondence showing NSP's $7,980 request and negotiated $2,000 deposit. The following pages reproduce the source document as provided, subject only to the noted removal of unrelated material.

AI summary Exhibit 8 contains a rock-breaking correspondence dated August 11, 2026, showing NSP's $7,980 request and a negotiated $2,000 deposit. The exhibit reproduces the source document with unrelated material removed.

NSPI charges for Rock breaking for WO 9650930 - BLANDFORD,NS
NSPI charges for Rock breaking for WO 9650930 - BLANDFORD,NS 6 messages Planning Coordinator Central Tue, Aug 11, 2026 at 8:11 AM Good morning, Please ensure you write your WO # on the payment itself be it cheque, money order, PO etc. Atta...

AI summary Nova Scotia Power Inc. (NSPI) has provided a quote for rock breaking services related to work order 9650930 in Blandford, NS. Payment instructions and a note about potential adjustments to the estimated cost are included in the message.

Exhibit 9
Exhibit 9 August 13, 2026 - NSP payment confirmation for the additional customer contribution. The following pages reproduce the source document as provided, subject only to the noted removal of unrelated material.

AI summary This exhibit provides a payment confirmation from NSP for an additional customer contribution on August 13, 2026. It includes the source document with unrelated material removed.

103755Email from Complainant with Attachments 1 passage
Preamble
Municipality uses to provide NSP with written confirmation of a building's permit status because NSP requires that confirmation before connecting service where no building permit has been issued? - 3. In your experience, is this form routi...

AI summary The document discusses a requirement by Nova Scotia Power (NSP) for written confirmation of a building permit before connecting electrical service, and whether this is a routine requirement or a project-specific request. The discussion also addresses the timing of the requirement and the origin of the exemption form.

103763Status Update from NSP - redacted 2 passages
\ \ EXTERNAL EMAIL / COURRIEL EXTERNE \ \
unicipal bylaws. The exemption form is NSP's requirement that it introduced extremely late in the process. The Municipality has since clarified the purpose of the form. On September 24, it explained: "Nova Scotia Power generally will not c...

AI summary The document discusses the introduction of an exemption form by Nova Scotia Power (NSP) as a requirement for connecting electrical service, which was introduced late in the process. The Municipality clarified the form's purpose, but its implementation caused delays and was not communicated in a timely manner.

\ \ EXTERNAL EMAIL / COURRIEL EXTERNE \ \
\ \ EXTERNAL EMAIL / COURRIEL EXTERNE \ \ xercise caution when opening attachments or clicking on littles / Faites preuve de prndence si vous ouvrez 1me piece jointe ou cliquez sur 1m lien Good afternoon, Please see attached on behalf of N...

AI summary An external email from Nova Scotia Power, sent by Carley Freeman, informs the recipient of an attachment filed with the NSEB on behalf of NS Power. The email includes standard legal and privacy notices.

103880Crabtree Response to NSPI Update - Redacted 6 passages
Rock-breaking refund
Rock-breaking refund The installation crew advised me that no rock breaking was required for any of the seven pole holes. NSP previously confirmed in writing that the deposit would be refunded if no rock breaking was required. I therefore...

AI summary The customer is requesting a refund of a $2,000 deposit from NSP, as no rock breaking was required for pole hole installations. NSP had previously confirmed in writing that the deposit would be refunded in such cases. The customer is not seeking damages but rather the return of the unused deposit as per NSP's commitment.

Preamble
Piyush This estimate assumes regular working hours (Monday-Friday, 8:00 am-4:00 pm) unless otherwise noted. The total price is an estimate only. Upon completion of the job, actual costs & applicable taxes will be reviewed and, if necessary...

AI summary The text provides an estimate for a service, noting that actual costs and applicable taxes will be reviewed post-job completion. Additional costs such as rock breaking, civil work, or non-NSP costs are excluded from the estimate.

NSPI charges for Rock breaking for WO 9650930 - 214 NEW HARBOUR RD BLANDFORD, NS
NSPI charges for Rock breaking for WO 9650930 - 214 NEW HARBOUR RD BLANDFORD, NS 6 messages To: Planning Coordinator Central Tue, Aug 11, 2026 at 8:12 a.m. Good morning, Please ensure you write your WO # on the payment itself be it cheque,...

AI summary The letter discusses NSPI's request for payment for rock breaking services, with the recipient expressing financial difficulty and questioning the necessity of the work. The recipient also notes prior payments for incomplete work and requests flexibility in payment arrangements.

Best, Jefferson Crabtree
Best, Jefferson Crabtree [Quoted text hidden] image001.jpg 3 KB Planning Coordinator Central Tue, Aug 11, 2026 at 4:38 p.m. To: Jefferson Crabtree Hi Jefferson, Thanks for your email. We can accept the $2,000.00 deposit for the rock breaki...

AI summary Jefferson Crabtree is communicating with Nova Scotia Power regarding a $2,000 deposit for rock breaking work. The deposit is refundable under certain conditions, and payment instructions are being discussed.

Break Rock for Pole Installation
Break Rock for Pole Installation You may hire your own contractor to complete the rock breaking and let us know once it's completed. Alternatively, our contractor can complete the rock breaking at a charge of $1000 + HST per

AI summary The document outlines two options for rock breaking at Break Rock for pole installation: hiring an independent contractor or using the company's contractor at a cost of $1000 plus HST per installation.

GETTING YOU CONNECTED
GETTING YOU CONNECTED Your Building Site Quote NSPI charges for Deposit for rock breaking. Site Address Email Address [email protected] Subtotal $ 1,754.39 JOB DETAILS COST BREAKDOWN Cost of Line Total Length of Line N/...

AI summary This document provides a quote for connection services by NSPI, including a deposit for rock breaking, with a subtotal of $1,754.39 and HST of $245.61, totaling $2,000.00. It notes that additional costs may apply and that the total is an estimate subject to review upon job completion.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →