N-2NSPI (NSEB) RIRs 1-11
7 passages
- I. Minister means the Minister of Environment and Climate Change and includes any person delegated the authority of the Minister. - m. Net Energy Output means gross energy output minus unit service power requirements. - n. Opacity means...
AI summary This section defines key terms relevant to regulatory processes, including 'Minister', 'Net Energy Output', 'Opacity', 'Relative Accuracy', 'Routine Maintenance', 'Sewage Treatment System', 'Shut-down', 'Site', 'Site Professional', 'Source Testing Event', 'Sponge Ball', and 'Start-up'. These definitions are likely used in regulatory contexts such as environmental compliance and emissions monitoring.
2. Scope - a. This Approval (the "Approval") relates to Nova Scotia Power Incorporated (the Approval Holder(s)) and their application and all documentation submitted to the Department prior to the issuance of this approval for the construc...
AI summary The Approval relates to Nova Scotia Power Incorporated's application for the construction, operation, and reclamation of a power plant at Point Aconi. The Site is restricted to the area outlined in the application and supporting documentation.
12. Reporting - a. The Approval Holder(s) shall provide an annual report to the Department by March 31st of each year summarizing the following information collected during the previous calendar year of operations, as required by the terms...
AI summary The Approval Holder(s) are required to submit an annual report to the Department by March 31st, summarizing information such as ash management, sewage treatment system monitoring results, complaints and resolutions, and incidents of non-compliance with the terms and conditions of the Approval.
16. Records Maintenance - a. The Approval Holder(s) shall keep all chemical and physical analyses reports required under this Approval for a period of not less than ten (10) years, unless otherwise stated in this Approval. - b. The Approva...
AI summary The section outlines requirements for the Approval Holder(s) to maintain various types of records, including chemical and physical analyses reports, calibration and maintenance records, and other data, for a minimum of ten years unless otherwise specified in the Approval.
1 Request IR-3: 2 3 Page 1 of the application states: "A cell is considered to have reached capacity when it meets 4 any of its critical design or regulatory thresholds — including maximum volume, final 5 elevation, permitted airspace, or...
AI summary The document discusses the capacity and regulatory thresholds of Cell 2 at the Point Aconi project, including its elevation limit of 41 meters above sea level and confirmation that it has reached its maximum design and regulatory volume. The response refers to attachments providing supporting documentation.
10.2 Notification - of All Incidents 10.2.1 All Contractors are required, as a condition of Contract, to immediately report all incidents involving personal injury, property damage or electrical contact, to the Nova Scotia Power Incorporat...
AI summary This section outlines the requirements for contractors to report incidents involving personal injury, property damage, or electrical contact to Nova Scotia Power Incorporated, as well as procedures for investigating serious incidents and distributing inquiry reports.
1 Request IR-4: 27 (b) The Cell 2 Interceptor Ditch is designed to divert non-contact surface runoff away from 28 the ash management area and Pond 7A, which is designated for ash-contacted water and 29 leachate. 1 Instead, this diverted wa...
AI summary The document discusses the routing of non-contact surface runoff from the Cell 2 Interceptor Ditch to Pond 7B, an unlined runoff collection pond, and its subsequent use or discharge. The discharge must comply with the Industrial Operating Approval No. 2007-058666-07.