Topic/Matter Intersection

Topic:"Regulatory Approval Processes" in M12371

Matter: Nova Scotia Power Inc. - CI C0061005 – POA Cell Capping 2025 – $2,530,405
10 passages 4 documents

Regulatory Approval Processes across all matters →

N-1Application 1 passage
Document No: XXX-XX-XXXX-XXXX p. p. 5
Document No: XXX-XX-XXXX-XXXX Project Cost Estimate Input Checklist and Maturity Matrix Integrated Project Plan Defined (D) NR P D D D Project Code of Accounts Defined (D) NR P D D D Project Schedule Regulatory Approval & Permitting Define...

AI summary The document presents a checklist and maturity matrix for project cost estimate inputs, focusing on various project planning and regulatory requirements. It details the status of different project components, such as the Integrated Project Plan, Risk Register, and Environmental Impact Assessment, with statuses ranging from 'Defined (D)' to 'Not Applicable (NA)'.

N-2NSPI (NSEB) RIRs 1-11 7 passages
1. Definitions p. p. 3
- I. Minister means the Minister of Environment and Climate Change and includes any person delegated the authority of the Minister. - m. Net Energy Output means gross energy output minus unit service power requirements. - n. Opacity means...

AI summary This section defines key terms relevant to regulatory processes, including 'Minister', 'Net Energy Output', 'Opacity', 'Relative Accuracy', 'Routine Maintenance', 'Sewage Treatment System', 'Shut-down', 'Site', 'Site Professional', 'Source Testing Event', 'Sponge Ball', and 'Start-up'. These definitions are likely used in regulatory contexts such as environmental compliance and emissions monitoring.

2. Scope p. p. 3
2. Scope - a. This Approval (the "Approval") relates to Nova Scotia Power Incorporated (the Approval Holder(s)) and their application and all documentation submitted to the Department prior to the issuance of this approval for the construc...

AI summary The Approval relates to Nova Scotia Power Incorporated's application for the construction, operation, and reclamation of a power plant at Point Aconi. The Site is restricted to the area outlined in the application and supporting documentation.

12. Reporting p. p. 3
12. Reporting - a. The Approval Holder(s) shall provide an annual report to the Department by March 31st of each year summarizing the following information collected during the previous calendar year of operations, as required by the terms...

AI summary The Approval Holder(s) are required to submit an annual report to the Department by March 31st, summarizing information such as ash management, sewage treatment system monitoring results, complaints and resolutions, and incidents of non-compliance with the terms and conditions of the Approval.

16. Records Maintenance p. p. 3
16. Records Maintenance - a. The Approval Holder(s) shall keep all chemical and physical analyses reports required under this Approval for a period of not less than ten (10) years, unless otherwise stated in this Approval. - b. The Approva...

AI summary The section outlines requirements for the Approval Holder(s) to maintain various types of records, including chemical and physical analyses reports, calibration and maintenance records, and other data, for a minimum of ten years unless otherwise specified in the Approval.

1 Request IR-3: p. p. 3
1 Request IR-3: 2 3 Page 1 of the application states: "A cell is considered to have reached capacity when it meets 4 any of its critical design or regulatory thresholds — including maximum volume, final 5 elevation, permitted airspace, or...

AI summary The document discusses the capacity and regulatory thresholds of Cell 2 at the Point Aconi project, including its elevation limit of 41 meters above sea level and confirmation that it has reached its maximum design and regulatory volume. The response refers to attachments providing supporting documentation.

10.2 Notification - of All Incidents p. p. 3
10.2 Notification - of All Incidents 10.2.1 All Contractors are required, as a condition of Contract, to immediately report all incidents involving personal injury, property damage or electrical contact, to the Nova Scotia Power Incorporat...

AI summary This section outlines the requirements for contractors to report incidents involving personal injury, property damage, or electrical contact to Nova Scotia Power Incorporated, as well as procedures for investigating serious incidents and distributing inquiry reports.

p. p. 184
1 Request IR-4: 27 (b) The Cell 2 Interceptor Ditch is designed to divert non-contact surface runoff away from 28 the ash management area and Pond 7A, which is designated for ash-contacted water and 29 leachate. 1 Instead, this diverted wa...

AI summary The document discusses the routing of non-contact surface runoff from the Cell 2 Interceptor Ditch to Pond 7B, an unlined runoff collection pond, and its subsequent use or discharge. The discharge must comply with the Industrial Operating Approval No. 2007-058666-07.

98615NSEB (NSPI) IR-1 to IR-11 1 passage
NOVA SCOTIA ENERGY BOARD
NOVA SCOTIA ENERGY BOARD IN THE MATTER OF: THE PUBLIC UTILITIES ACT - and - IN THE MATTER OF: AN APPLICATION by NOVA SCOTIA POWER INC. for Approval of CI C0061005 – POA Cell Capping 2025 – $2,530,405 INFORMATION REQUESTS To: Lana Myatt, Se...

AI summary The Nova Scotia Energy Board has issued an information request to Nova Scotia Power Inc. regarding its application for approval of the CI C0061005 – POA Cell Capping 2025 – $2,530,405. Responses are due by August 11, 2025, and the request is part of the proceeding under the Public Utilities Act.

98915Letter enclosing IR responses 1 passage
Section 1 p. p. 0
August 11, 2025 Crystal Henwood Regulatory Affairs Officer/Clerk Nova Scotia Energy Board 1601 Lower Water Street, 3rd Floor P.O. Box 1692, Unit "M" Halifax, NS B3J 3S3 Re: M12371 – CI C0061005 – POA Cell Capping 2025 – IR Responses Dear M...

AI summary NS Power has submitted responses to information requests regarding the capital item 'CI C0061005 – POA Cell Capping 2025' as part of the regulatory proceeding M12371. The responses were submitted on August 11, 2025, following the receipt of the IRs on July 18, 2025.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →