1.0 PROJECT DESCRIPTION
p. pp. 13-14
1.0 PROJECT DESCRIPTION In January 2006, AMEC completed a Dam Safety Review (DSR) of the Carleton Dam. At the time, it was recommended that the dam be upgraded in order to meet the minimum criteria of the 1999 Canadian Dam Association (CDA...
AI summary The Carleton Dam requires upgrades to meet safety guidelines, including raising embankments, installing concrete overlays, and replacing timber structures. AMEC proposes conceptual design and cost estimates, with NSPI responsible for fishway design. Discussions address construction methods like cofferdamming.