Matter: CI# 28726 - P-128.10 - NSPI WO - HYD - Carlton Lake Dam Refurbishment - $3,104,448
1 passage 1 document

Regulatory Compliance across all matters →

N-1Redacted Work Order 4/30/2010 1 passage
1.0 PROJECT DESCRIPTION p. pp. 13-14
1.0 PROJECT DESCRIPTION In January 2006, AMEC completed a Dam Safety Review (DSR) of the Carleton Dam. At the time, it was recommended that the dam be upgraded in order to meet the minimum criteria of the 1999 Canadian Dam Association (CDA...

AI summary The Carleton Dam requires upgrades to meet safety guidelines, including raising embankments, installing concrete overlays, and replacing timber structures. AMEC proposes conceptual design and cost estimates, with NSPI responsible for fishway design. Discussions address construction methods like cofferdamming.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →