REDACTED CI C0083589 Attachment 1 Page 3 of 40 REDACTED (CONFIDENTIAL INFORMATION REMOVED) - Section 4 of this report. The Interconnection Customer must comply with the Interconnection Facility requirements listed in Section 6 of this repo...
AI summary The document outlines interconnection requirements for the Brooklyn Solar Site, including compliance with power factor standards, flicker emission protocols, and NSPI's operational control over high-voltage equipment. It emphasizes adherence to electrical codes, inspection processes, and potential disconnection risks if flicker issues persist.