Generated 2025-09-18 - Checklist INSP-PM-TOOLS - Checklist: INSP-PM-TOOLS Author: Description: ANNUAL MECHANICAL INSPECTION TOOLING LIST Date: WO#: 169079 Building# - Eqp#: 01W1-02-02 - TURBINE Task Result Comments BARK AIR MONITORS LONG F...
AI summary This document is a checklist titled 'INSP-PM-TOOLS' used for annual mechanical inspections, listing various tools and equipment required for turbine inspection tasks. It includes items such as borescopes, vernier calipers, and safety gear like rubber boots and raingear. The document is part of a larger regulatory proceeding and contains redacted confidential information.
Generated 2025-09-18 - Checklist PM-ELEC01 - Description: ANNUAL ELECTRICAL INSPECTION Date: 2021-06-09
AI summary The document is an annual electrical inspection checklist generated on September 18, 2025, with a reference to an inspection dated June 9, 2021. It appears to be a procedural or compliance tool used in the regulatory process.
Excessive HPU pump run time. Location: Kaplan Blade Servomotor Specification: General Condition of Component ITM Complete: Yes No Comments: [Insert picture here, additional picture can be attached in "Attachments"] CI C0057983 NSEB IR-1 At...
AI summary The document discusses excessive HPU pump run time at the Kaplan Blade Servomotor location, with a focus on the general condition of the component and inspection and testing methods. It includes a redacted attachment from the NSEB IR-1 proceeding.