Topic/Matter Intersection

Topic:"Resource Costs" in M06733

Matter: E-ENS-R-15 - EfficiencyOne Application for approval of a Supply Agreement for Electricity Efficiency and Conservation Activities between Efficiency One and Nova Scotia Power Inc.- NSPI - 2016-2019 DSM Plan IN THE MATTER OF AN APPLICATION for Approval of a Supply Agreement for electricity efficiency and conservation activities between EfficiencyOne and Nova Scotia Power Incorporated, the establishment of a final agreement between the parties, and approval of a 2016-2018 Demand Side Management Resource Plan
7 passages 4 documents

Resource Costs across all matters →

E-7E1 (NSPI) RIR-1 to RIR-47 4 passages
Section 29
S-R-15) E1 Responses to NSPI Information Requests NON-CONFIDENTIAL 1 Figure 1 - 2016-2018 DSM Resource Plan Investment and Savings Incremental Incremental Annual Net Annual Net Program Ratepayer Impact Investment Lifetime Benefits Total Re...

AI summary The figure presents data on investment and savings for the 2016-2018 DSM Resource Plan, including metrics like annual net energy savings, demand savings, and cost tests (TRC and PAC). It highlights the financial and energy efficiency aspects of the program.

Section 31
g lifetime benefits to ENS’s costs. d RIM is a benefit/cost ratio comparing lifetime benefits to ENS’s costs and NSPI lost revenues. 2 3 Figure 2 - 2016 DSM Resource Plan Investment and Savings Incremental Incremental Annual Net Annual Net...

AI summary The text discusses metrics used in evaluating the 2016 DSM Resource Plan, including RIM, TRC, and PAC. These metrics compare lifetime benefits to ENS’s costs and NSPI’s lost revenues, focusing on energy and demand savings.

Section 364
Comparison of 8760 Resource Savings Profile Comparison of 8760 Resource Savings Profile Comparison of 8760 Resource Savings Profile Between Initial and Final 8760 Models Between Initial and Final 8760 Models Between Initial and Final 8760...

AI summary The text presents a comparison of 8760 Resource Savings Profile data between initial and final models, showing minimal differences in kW/Annual kWh savings across various time intervals. This analysis focuses on RES-Lighting metrics over specific dates and times.

Section 612
Comparison of 8760 Resource Savings Profile Comparison of 8760 Resource Savings Profile Comparison of 8760 Resource Savings Profile Between Initial and Final 8760 Models Between Initial and Final 8760 Models Between Initial and Final 8760...

AI summary The text presents a comparison of 8760 Resource Savings Profile data between initial and final models, showing minimal differences in kW/Annual kWh savings across various dates and times. This data may be relevant to energy efficiency and resource planning discussions.

E-9Revised Response by E1 to NSPI IR-17, Attachment 2- Excel Spreadsheet 1 passage
Deltas
Deltas Comparison of 8760 Resource Savings Profile Between Initial and Final 8760 Models (kW/ Annual kWh Savings) Unnamed: 1 Unnamed: 2 Unnamed: 3 Unnamed: 4 Comparison of 8760 Resource Savings Profile Between Initial and Final 8760 Models...

AI summary The text presents a detailed table comparing the 8760 Resource Savings Profile between initial and final models, showing minute differences in kW/Annual kWh savings across various time intervals. The data highlights small variations in energy savings over time, indicating a focus on resource efficiency and modeling accuracy.

E-12NSPI (EAC) RIRs to IR-1 to IR-8 1 passage
NON-CONFIDENTIAL
NON-CONFIDENTIAL 1 Request IR-7: В Eliminate TRC's < 1.0 Allow implemention costs to vary +/- 20% Allow incentive costs to vary from the E1 minimum Participation is estimated as a function of program cost, with goal ~ Scen. A 381.7 60.5 $...

AI summary The table presents various proposals related to program costs, participation goals, and TRC ratios. It includes different scenarios for implementing energy efficiency programs and their associated costs, peak demand, and cumulative energy savings. The data reflects variations in program costs and their impact on TRC ratios.

E-15NSPI (Multeese) RIRs to IR-1 to IR-19 - Redacted 1 passage
Low DSM Preliminary Load and Resources p. pp. 19-20
Low DSM Preliminary Load and Resources 2015 2016 2017 2018 2019 2020 2021 2022 2023 2024 2025 2030 2035 2036 2037 2038 2039 Firm Peak 1,963 1,986 2,000 2,020 2,041 2,066 2,077 2,097 2,118 2,147 2,159 2,251 2,345 2,364 2,383 2,403 2,422 DSM...

AI summary The document presents a table analyzing low DSM (Demand Side Management) preliminary load and resources over multiple years, showing trends in firm peak demand, DSM contributions, required and existing MWs, resource additions, and surplus/deficit MWs above RM (Required Margin). It also includes data on reserve margins and capacity additions.

Disclaimer: These summaries were generated by AI from the filings they describe. We take care to make them accurate, but errors are possible - and they aren't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →