N-1Integrated Resource Plan Action Plan Update 2025
4 passages
Planning Environment Updates Clean Electricity Regulations – Alignment to Provincial Policy - Roadmap Item 5 Emitting generation is required to balance wind and ensure grid reliability and to meet customer demand - o Level of use of emitti...
AI summary The document outlines Nova Scotia Power's (NSP) alignment of the Clean Electricity Regulations (CER) with provincial policy, emphasizing the need for emitting generation to balance wind energy and ensure grid reliability. It highlights the 80% renewable energy target by 2030, the role of combustion turbines as fast-acting generation, and the CER's support for thermal fleet flexibility.
Electrification Impacts – T&D System Action Plan Item 2c & Roadmap Item 6 As outlined in Roadmap Item 6 , NS Power continues to monitor electrification and load growth, to reflect these impacts in developed load forecasts for Nova Scotia....
AI summary NS Power is analyzing electrification impacts on its transmission and distribution system, leveraging SCADA and AMI data to refine load forecasts, model system peaks, and identify overloaded equipment. Improved modelling techniques now capture varied peak patterns (morning, afternoon, summer) and enable granular feeder-level load reallocation.
Electrification Impacts – T&D System Action Plan Item 2b & Roadmap Item 6 The 2024 load forecast, the Province's Clean Power Plan and the 2024 10 Year System Outlook provide a clear picture of the generation resources required to serve loa...
AI summary The 2024 load forecast, Clean Power Plan, and 10-Year System Outlook outline generation resource needs. NERC TPL assessment identified three corrective actions, including transformer upgrades and corridor adjustments. Overloaded feeders and transformers are expected but manageable within 5-10 years. Detailed studies were completed in 2024, with planning studies prioritized for 2025.
Thermal investment: The sustaining capital profiles for the thermal units have been updated based on the Evergreen IRP utilization factor approach and the 2030 coal phase out requirements. To maintain resource adequacy while minimizing cap...
AI summary Thermal unit capital profiles were updated using the Evergreen IRP approach and 2030 coal phase-out requirements. Operating restrictions at Trenton 5 limit hours to maintain resource adequacy while minimizing capital investment.
N-9NSEB (Natural Forces) RIR-1, Att 1 - Refiled
2 passages
Generation Resource MW Thermal 1392 CT's 226 Hydro 168 Wind 33 Tidal 0 Biomass 56 Maritime Link 150 Maritime Link Imports 7 Other Imports 51 Battery 0 System Peak (MW) and Time (HE) February 21 @ 9AM
AI summary The table lists Nova Scotia's electricity generation resources with their capacities in MW, including Thermal, Hydro, Wind, Biomass, and imports. It also notes the system peak on February 21 at 9AM. The data highlights the distribution of power sources and system load.
Peak Load Hour 1/9/2035 18:00 Installed Capacity (MW) 1/8/2035 7:00 0 144 550 0 0 106 2 71 573 0 0 0 0 0 575 2021 0.0 1/8/2035 8:00 0 144 550 0 0 318 4 75 705 0 192 0 0 0 50 2039 0.9 1/8/2035 9:00 0 144 750 0 0 294 5 75 421 4 175 0 0 0 300...
AI summary The document presents a table detailing installed capacity and load data for various times on January 8, 2035, leading up to the peak load hour on January 9, 2035, at 18:00. It includes metrics such as demand, generation, and capacity across different time intervals.
98833Submissions - Synapse
7 passages
C ONTENTS 1. SUMMARY OF FINDINGS 2. Background 3 3. 2025 Action Plan Update 6 3.1. Changes to Electricity Planning Environment 7 3.2. Progress Updates on Action Plan Items for 2024/2025 to Date 8 3.3. Progress Updates on Roadmap Items for...
AI summary The document provides a summary of findings from a regulatory proceeding, outlining key points such as the lack of justification for 600 MW of new CTs by 2030, the need for a new Evergreen IRP, and discussions on reliability tie and Mersey matters.
The Reliability Tie provides resource adequacy insurance in addition to reliability benefits While it is reasonable that NS Power did not directly incorporate the modeling results used in the Reliability Tie application (M12217) into the I...
AI summary The Reliability Tie offers resource adequacy insurance and reliability benefits. NS Power's modeling in M12217 was not fully integrated into the IRP Update, and Synapse's evidence highlights gaps in the model's comprehensiveness, including outdated load forecasts and cost trends for combustion turbines (CTs). The Tie's ability to allow 100 MW of incremental firm import was excluded from primary cases, affecting 2030 CT resource needs.
d peak building electrification options. - 5. Avoided Costs of Demand-Side Management (DSM): NSPI stated that it would update the avoided costs of DSM, targeting completion before the end of 2023. NSPI also identified 11 Roadmap items that...
AI summary NSPI plans to update DSM avoided costs by 2023 and monitor factors like wind integration and fuel costs. Synapse criticized the exclusion of Atlantic Loop from the Preferred Plan, emphasized Reliability Tie development, supported solar/wind procurement, advocated for accelerated battery storage, and urged updated capacity accreditation studies for IRP accuracy.
Table 1. Related Documents and Efforts Release Date Document Description June 30, 2023 2023 10-Year System Outlook Based on 4/30/23 load forecast update and the Evergreen IRP modeling results August 8, 2023 2023 IRP Based on modeling condu...
AI summary The document outlines a series of related documents and efforts in Nova Scotia's energy sector, including system outlooks, integrated resource plans, electrification reports, and reliability studies. These documents are based on load forecasts and modeling updates conducted over several years, with ongoing stakeholder engagement and revisions to project scopes.
2025 10-Year System Outlook, pages 45-46, "The capacity additions and retirements are in alignment with the CE1-E1-R2 Evergreen IRP scenario and the Province of Nova Scotia's 2030 Clean Power Plan." from New Brunswick, the current relative...
AI summary The 2025 10-Year System Outlook report shows a 25% reserve margin by 2029/2030, indicating a 119 MW surplus, but NS Power has not adjusted its capacity plans. The report does not address potential impacts of battery storage, ELCC parameter changes, or the Net Zero Atlantic study on 2030 resource needs, despite these factors possibly reducing peak load forecasts.
Table 2. New CT Capacity as Percent of Firm Peak Load in IRP, 10-Year System Outlook reports and Reliability Intertie modeling 2030 Nameplate Capacity New CT Capacity as Percent of Firm Peak 2023 IRP 20% 2023 System Outlook 29% 2024 System...
AI summary Table 2 presents the percentage of new combustion turbine (CT) capacity relative to firm peak load in various planning documents, including the Integrated Resource Plan (IRP) and 10-Year System Outlook reports, as well as Reliability Intertie modeling. The data shows varying percentages from 20% to 29% across different years and models.
4.3. Reliability Tie Completion of the Reliability Tie goes a long way towards ensuring Nova Scotia can reliably comply with 2030 coal retirements without necessarily going above 300 MW of new CTs by that year. New Brunswick is completing...
AI summary The Reliability Tie project enhances Nova Scotia's ability to meet 2030 coal retirement targets without exceeding 300 MW of new CTs. New Brunswick's transmission work allows 100 MW of firm imports, supported by battery storage, ELCC updates, and demand response. The 2025 10-Year System Outlook shows a 25% reserve margin, suggesting current 450 MW CT levels suffice for resource adequacy.
99228Reply Submissions - NS Power
3 passages
not allow for delay of critical system planning work to begin while the NSIESO transfer process is completed.[3](#page-3-2) DATE FILED: September 4, 2025 Page 4 of 19 Synapse Submission, Re: Comments on Nova Scotia Power's 2025 Integrated...
AI summary The transition of IRP responsibilities to NSIESO raises concerns about potential planning gaps during the transfer. Submissions highlight uncertainty in the transition timeline and the need for continuous system planning. NSIESO has initiated steps like establishing a Board of Directors and filing its first Expenditure and Revenue Requirement application (M12412).
those activities, such that there is no gap in work required to set-up the NSIESO for success. Namely, NS Power will continue to advance work on the Effective Load Carrying Capacity (ELCC) study, as well as continued participation in the N...
AI summary NS Power highlights ongoing efforts to prepare the NSIESO for success, including the ELCC study and participation in the Net Zero Atlantic Hybrid Peak study. It also references the Evergreen IRP and PLEXOS modeling from previous proceedings, such as the Reliability Intertie application (M12217), to support its planning assumptions and modeling accuracy.
DATE FILED: September 4, 2025 Page 9 of 19 2023 Load Forecast Report (M11108), April 28, 2023, Figure 2: Historical and Predicted Annual System Peak, page 8. 2023 10 Year System Outlook Report (M11221), June 30, 2023, Figure 19: NS Power 1...
AI summary The document discusses the need for additional firm capacity, particularly fast-acting generation, to maintain the target PRM in Winter 2029/30 and support the transition off coal as outlined in the 2025 10-Year System Outlook Report. It references the Evergreen IRP and the Province's Clean Power Plan, and notes that NS Power supports the procurement of 300 MW of fast-acting generation.