Why do this project? This project was completed to allow Lingan Unit 2 to operate safely through 2025 and early 2026. Lingan Unit 2 is required to meet the demands of the NS Power system per the 2025 10-Year System Outlook (10YSO), which c...
AI summary This project ensures Lingan Unit 2 can operate safely through 2025 and early 2026. The unit is kept in cold reserve to maintain reliable supply for firm customer load, as outlined in the 2025 10-Year System Outlook. It will remain in reserve until new firm fast-acting generation resources are online and reliable.