05028 Key documents

Board Decision Letter 8/19/2010

Download original
05028.pdf · PDF · 60.3 KB · 1 page
AI overviewWhat this document contains

This document is a Board Decision Letter from the Nova Scotia Utility and Review Board dated August 19, 2010. It contains the Board’s approval of a request by Nova Scotia Power Inc. for an unbudgeted work order to replace deteriorated frost protection on a surge tank, including the installation of a compressor and air bubbler system.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M03427 — CI# 39844 - P-510 - NSPI WO - U&U Removal of Frost Casing on Gulch Surge Tank $545,604