Non-Confidential Work Order 7/30/2010
N-1.pdf · PDF · 1.5 MB · 11 pages
AI overviewWhat this document contains
This document is an exhibit containing information related to a capital project for the removal of deteriorated frost casing on the Gulch Surge Tank and the installation of a bubbler to prevent freezing within the Bear River Hydro System. Topics covered include project cost estimates, budget forecasts, justification for the project under health and safety criteria, and details of proposals and quotations submitted for the work.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M03427 — CI# 39844 - P-510 - NSPI WO - U&U Removal of Frost Casing on Gulch Surge Tank $545,604
Filing event: ORDER on unknown · View digest →