N-1-(v) Exhibits 08/14/2019

Appendix G - Base Case Achievable 8760 Loadshape Disaggregation

Download original
N-1-(v).xlsx · XLSX · 1.5 MB

The AI overview for this document is being prepared.

Filed in: M08929 — P-884 - Nova Scotia Power Inc. (NSPI) - Integrated Resource Planning (IRP) and M08059--Generation Utilization and Optimization

Filing event: CLOSING_EVIDENCE on 08/14/2019 · View digest →

Preview isn’t available for this file type — use Download original above to view it.