N-2(C)
Exhibits
12/21/2018
Hydro Asset Study - Confidential
N-2(C).pdf · PDF · 109.4 KB · 1 page
No AI summary available — too little text in this document to summarize.
Filed in: M08929 — P-884 - Nova Scotia Power Inc. (NSPI) - Integrated Resource Planning (IRP) and M08059--Generation Utilization and Optimization
Filing event: APPLICATION on 12/21/2018 · View digest →