N-2 Exhibits 12/21/2018

Hydro Asset Study - REDACTED

Download original
N-2.pdf · PDF · 82.9 MB · 665 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of a regulatory matter with the Nova Scotia Energy Board, containing a redacted Hydro Asset Study conducted by Nova Scotia Power Incorporated. It covers topics related to the assessment of hydroelectric systems in Nova Scotia, including sustaining and decommissioning costs, infrastructure evaluation, environmental considerations, sediment management, archaeological assessments, and battery storage, though much of the content is confidential and redacted.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M08929 — P-884 - Nova Scotia Power Inc. (NSPI) - Integrated Resource Planning (IRP) and M08059--Generation Utilization and Optimization

Filing event: APPLICATION on 12/21/2018 · View digest →

665 pages
100%