N-4 Exhibits 12/16/2019

Draft Terms of Reference

Download original
N-4.pdf · PDF · 2.2 MB · 43 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains the draft Terms of Reference for the 2020 Integrated Resource Plan (IRP) developed by Nova Scotia Power Inc. (NS Power) in collaboration with consultants, along with stakeholder feedback and responses, discussions on climate and decarbonization goals, modeling approaches, evaluation criteria, and the process for developing and implementing the IRP.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M08929 — P-884 - Nova Scotia Power Inc. (NSPI) - Integrated Resource Planning (IRP) and M08059--Generation Utilization and Optimization

Filing event: APPLICATION on 12/16/2019 · View digest →

43 pages
100%