75513 Other documents 10/05/2018

Board letter re IRP process and M08059 - Generation Utilization and Optimization

Download original
75513.pdf · PDF · 164.3 KB · 4 pages
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board (NSEB) regulatory matter. It contains a letter from Judith Ferguson, Executive Vice-President of Nova Scotia Power Inc., initiating a regulatory proceeding, and details the Board's conclusions regarding the need for an Integrated Resource Planning (IRP) analysis following a review of Synapse's May 2018 report. The document outlines nine initial recommendations for the IRP process, key considerations for resource planning, and actions related to generation utilization and optimization, including timelines for pre-IRP analyses and the DSM Potential Study.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M08929 — P-884 - Nova Scotia Power Inc. (NSPI) - Integrated Resource Planning (IRP) and M08059--Generation Utilization and Optimization

4 pages
100%