Letter enclosing DSM Potential Study
78518.pdf · PDF · 313.2 KB · 7 pages
AI overviewWhat this document contains
This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter. It contains a letter enclosing the 2019 DSM Potential Study Report, including appendices, along with details about the study's methodology, stakeholder engagement process, revisions to the scope of work, and responses to stakeholder feedback throughout the development of the study.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M08929 — P-884 - Nova Scotia Power Inc. (NSPI) - Integrated Resource Planning (IRP) and M08059--Generation Utilization and Optimization
Filing event: CLOSING_EVIDENCE on 08/14/2019 · View digest →