80049 Other documents 01/09/2020

Letter from SBA re no further comments

Download original
80049.pdf · PDF · 299.7 KB · 1 page

No AI summary available — too little text in this document to summarize.

Filed in: M08929 — P-884 - Nova Scotia Power Inc. (NSPI) - Integrated Resource Planning (IRP) and M08059--Generation Utilization and Optimization

Filing event: APPLICATION on 01/09/2020 · View digest →

1 page
100%