N-8 Exhibits 12/17/2024

Midgard Evidence - Redacted

Download original
N-8.pdf · PDF · 3.7 MB · 54 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains a report by Midgard Consulting Inc. reviewing Nova Scotia Power Inc.'s Authorization to Overspend (ATO) application for the Ruth Falls Main Dam Refurbishment Project, including analysis of cost increases, environmental permitting challenges, Mi'kmaq engagement, archaeological considerations, and regulatory interactions.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M11927 — Nova Scotia Power Inc. - CI 50518 – HYD Ruth Falls Main Dam Refurbishment – $15,445,508 (ATO)

Filing event: APPLICATION on 12/17/2024

54 pages
100%