Hearing Order
95670.pdf · PDF · 139.9 KB · 2 pages
AI overviewWhat this document contains
This document is an exhibit filed as part of an order batch in a regulatory matter before the Nova Scotia Energy Board. It contains a Hearing Order related to an application by NS Power for an Authorization to Overspend on the HYD Ruth Falls Main Dam Refurbishment project, including procedural details such as the timetable for interventions, evidence submissions, and the possibility of a paper or oral hearing.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M11927 — Nova Scotia Power Inc. - CI 50518 – HYD Ruth Falls Main Dam Refurbishment – $15,445,508 (ATO)
Filing event: ORDER on 10/21/2024