NSUARB (NSPI) IR-1 to 13
95871.pdf · PDF · 188.0 KB · 8 pages
AI overviewWhat this document contains
This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains a series of information requests from the Nova Scotia Utility and Review Board to Nova Scotia Power Inc. regarding the HYD Ruth Falls Main Dam Refurbishment project, including project timelines, cost estimates, design guidelines, scope of work, environmental and geotechnical considerations, and responses to previous regulatory proceedings.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M11927 — Nova Scotia Power Inc. - CI 50518 – HYD Ruth Falls Main Dam Refurbishment – $15,445,508 (ATO)
Filing event: APPLICATION on 11/12/2024