N-1 Exhibits 07/07/2025

Application - Redacted

Download original
N-1.pdf · PDF · 1.3 MB · 11 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch with the Nova Scotia Energy Board. It contains detailed information about a capital project authorization for the refurbishment of LP, HP, and IP turbine components at the Point Aconi steam turbine, including budget and expenditure details, project timelines, cost estimates, contingency planning, and compliance with regulatory requirements.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12370 — Nova Scotia Power Inc. - CI C0061003 – POA LP HP IP Turbine Refurbishment – $4,861,261

Filing event: APPLICATION on 07/07/2025

11 pages
100%