N-2 Exhibits 08/11/2025

NSPI (NSEB) RIRs 1-14 - Redacted

Download original
N-2.pdf · PDF · 1.4 MB · 28 pages
AI overviewWhat this document contains

This document is an exhibit containing responses to information requests (RIRs) filed as part of a regulatory matter before the Nova Scotia Energy Board. It covers topics including the Point Aconi generating unit's capacity, emissions, retirement plans, turbine refurbishment project details, capital investment plans, fuel costs, condition assessments, overhaul thresholds, procurement strategies, cost classification, and the impact of not proceeding with the refurbishment project.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12370 — Nova Scotia Power Inc. - CI C0061003 – POA LP HP IP Turbine Refurbishment – $4,861,261

Filing event: RIR on 08/11/2025

28 pages
100%