N-1(C)
Exhibits
09/29/2025
BESS - Interim Report - Confidential
N-1(C).pdf · PDF · 133.8 KB · 1 page
No AI summary available — too little text in this document to summarize.
Filed in: M12494 — Nova Scotia Power Inc. - Battery Energy Storage System Project (BESS) – Interim Report
Filing event: APPLICATION on 09/29/2025