N-1 Exhibits 09/29/2025

BESS - Interim Report - Redacted

Download original
N-1.pdf · PDF · 603.0 KB · 6 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains an interim report by Nova Scotia Power on its Battery Energy Storage System (BESS) Project, covering actual costs, projected completion dates, external funding updates, and progress at the Bridgewater, Spider Lake, and White Rock Road BESS sites.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12494 — Nova Scotia Power Inc. - Battery Energy Storage System Project (BESS) – Interim Report

Filing event: APPLICATION on 09/29/2025

6 pages