99785 Other documents 10/24/2025

Board Letter re: Accepted as filed

Download original
99785.pdf · PDF · 263.3 KB · 2 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains a letter from Mary Ellen Greenough, Director of Legal and Regulatory at Nova Scotia Power Incorporated, and provides information about the approval and progress of Nova Scotia Power Inc.'s $237.7 million Battery Energy Storage System (BESS) Project, including its timeline and cost status.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12494 — Nova Scotia Power Inc. - Battery Energy Storage System Project (BESS) – Interim Report

Filing event: APPLICATION on 10/24/2025

2 pages
100%