NSEB (NSPI) IR 8 to 11 - WORD
100241.docx · DOCX · 28.7 KB
AI overviewWhat this document contains
This document is an IR response covering information provided by Nova Scotia Power Inc. in response to information requests from the Nova Scotia Energy Board regarding the status and performance of Big Falls Unit 6, including its energy production data, reasons for low output compared to Unit 5, and the status of refurbishment projects.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12508 — Nova Scotia Power - CI C0080112 – HYD Big Falls Unit 6 Rotor Re-Insulation (U&U) - $1,025,626
Filing event: APPLICATION on 12/09/2025
Preview isn’t available for this file type — use Download original above to view it.