N-1-(iii) Exhibits 10/22/2025

Appendix C - Excel

Download original
N-1-(iii).xlsx · XLSX · 262.0 KB

The AI overview for this document is being prepared.

Filed in: M12521 — Nova Scotia Power Inc. - Application for 2026 DSM Cost Recovery Rider (DCRR)

Filing event: APPLICATION on 10/22/2025

Preview isn’t available for this file type — use Download original above to view it.