N-4(C) Exhibits 03/25/2026

Midgard (CA) RIR 1 to 9 - Confidential

Download original
N-4(C).pdf · PDF · 97.5 KB · 1 page

No AI summary available — too little text in this document to summarize.

Filed in: M12550 — To obtain a cost reasonableness review of NS Power - CI C0051815 – $5,959,515 - RTU Replacements Program – Phase 6, as outlined in Section 2.1 of the ACE 2025 decision (M12012)

Filing event: RIR on 03/25/2026

1 page
100%