101738 Other documents 04/24/2026

Submission - SBA

Download original
101738.pdf · PDF · 1.1 MB · 2 pages
AI overviewWhat this document contains

This document is an exhibit filed as part of an application batch in a Nova Scotia Energy Board regulatory matter. It contains a submission from the Small Business Advocate (SBA) regarding NS Power's revised cost estimate for the RTU Phase 6 project, Midgard Consulting's findings on the cost variance and recommendations, NS Power's rebuttal, and the SBA's conditional support for proceeding with the project.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12550 — To obtain a cost reasonableness review of NS Power - CI C0051815 – $5,959,515 - RTU Replacements Program – Phase 6, as outlined in Section 2.1 of the ACE 2025 decision (M12012)

Filing event: APPLICATION on 04/24/2026

2 pages