101131 Other documents 03/04/2026

IG (Protech & Midgard) IR 1 to 3 - Word

Download original
101131.docx · DOCX · 37.1 KB
AI overviewWhat this document contains

This document is an information request (IR) filed by the Industrial Group in a Nova Scotia Energy Board regulatory matter. It covers an IR issued to Midgard Consulting Inc. and Protech Engineering Inc. regarding the RTU Replacements Program – Phase 6, including questions about labour estimates, cost reasonableness, and the impact of a proposed 30% reduction in labour hours.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12550 — To obtain a cost reasonableness review of NS Power - CI C0051815 – $5,959,515 - RTU Replacements Program – Phase 6, as outlined in Section 2.1 of the ACE 2025 decision (M12012)

Filing event: APPLICATION on 03/04/2026