NSPI (NSEB) RIR 1 to 2
N-2.pdf · PDF · 10.0 MB · 74 pages
AI overviewWhat this document contains
This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter, containing detailed maintenance and inspection records for generators and turbines at the Hollow Bridge and Black River facilities. It includes information on past and ongoing maintenance activities, generator performance data, maintenance costs, inspection checklists, work orders, and results of electrical and mechanical inspections conducted from 2020 to 2025.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12596 — Nova Scotia Power Inc. - CI C0080228 – HYD Hollow Bridge Generator Refurbishment - $2,587,170 (U&U)