100753 Key documents 01/29/2026

Board Decision Letter

Download original
100753.pdf · PDF · 366.5 KB · 3 pages
AI overviewWhat this document contains

This document is a Board Decision Letter that contains the approval of a capital expenditure request by Nova Scotia Power Inc. for the refurbishment of the Hollow Bridge Hydro Unit generator, covering the project's cost, timeline, and filing type.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12596 — Nova Scotia Power Inc. - CI C0080228 – HYD Hollow Bridge Generator Refurbishment - $2,587,170 (U&U)

3 pages
100%