100288 Other documents 12/12/2025

NSEB (NSPI) IR 1 to 2 - WORD

Download original
100288.docx · DOCX · 31.0 KB
AI overviewWhat this document contains

This document is an IR response submitted in a Nova Scotia Energy Board regulatory matter. It contains technical information regarding NS Power's request to refurbish the Hollow Bridge generator, including details on the generator's failure due to insulation degradation, the extent of damage, and related maintenance and testing considerations.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12596 — Nova Scotia Power Inc. - CI C0080228 – HYD Hollow Bridge Generator Refurbishment - $2,587,170 (U&U)

Preview isn’t available for this file type — use Download original above to view it.