N-51 Exhibits 09/29/2026

PHP Aide to Cross - Synapse IR-24 Attachment 1

Download original
N-51.pdf · PDF · 58.8 KB · 3 pages
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter, specifically as part of the ELID Tariff Synapse IR-24 attachment. It contains tables with energy demand data, downtime energy, running energy, and calculated average load values for various months in 2023, 2024, and 2025.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12661 — Nova Scotia Power - Application for approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (PHP)

Filing event: APPLICATION on 09/29/2026 · View digest →

3 pages
100%
⬇