101225 Other documents 03/12/2026

Synapse (NSPI) IR 1 to 30 - Word

Download original
101225.docx · DOCX · 46.4 KB
AI overviewWhat this document contains

This document is an information request (IR) filed in a Nova Scotia Energy Board (NSEB) regulatory matter. It contains a series of detailed questions directed at Nova Scotia Power regarding various aspects of tariff structures, cost allocation methods, load management practices, and the implications of specific riders and tariff proposals, including the Extra Large Industrial Dispatchable Above-the-Line Tariff, Large Industrial Interruptible Rider, and ELID Tariff.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12661 — Nova Scotia Power - Application for approval of an Above-the-Line Tariff applicable to Port Hawkesbury Paper (PHP)Application for approval of the Extra Large Industrial Dispatchable (ELID) Tariff, an above-the-line- tariff available to Port Hawkesbury Paper

Preview isn’t available for this file type — use Download original above to view it.