B-1 Exhibits 04/08/2026

BEC Factorydale Refurbishment Capital Application

Download original
B-1.pdf · PDF · 548.0 KB · 7 pages
AI overviewWhat this document contains

This document is an exhibit filed in a Nova Scotia Energy Board regulatory matter. It contains a Capital Work Order Application for the refurbishment of the Factorydale Hydropower Plant, including project details, cost estimates, justification, funding sources, appendices with technical analyses, and the location of the project.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12795 — Town of Berwick Electric Commission - Factorydale Hydropower Plant Refurbishment - $6,000,000

7 pages
100%