S-3 Exhibits 05/11/2026

NSPI Response to Appeal (redacted)

Download original
S-3.pdf · PDF · 789.4 KB · 8 pages
AI overviewWhat this document contains

This document is an intervenor response filed by Nova Scotia Power Inc. (NS Power) in a Nova Scotia Energy Board regulatory matter, addressing an appeal against a March 2026 DRO decision related to a 2025 billing dispute. It covers the customer’s claims of billing errors due to alleged incorrect meter readings, NS Power’s correction of a manually misentered meter reading, the resulting credit and revised billing, and the DRO’s findings supporting NS Power’s position under Regulation 5.1. The response includes details about payment arrangements, the customer’s refusal of digital meters, and a signature dated May 11, 2026.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12804 — NSPI DRO Appeal - Billing Issues - Jillian Coxhead

Filing event: APPLICATION on 05/11/2026 · View digest →

8 pages
100%