NSPI (NSEB) RIR-1 to RIR-11
H-5.pdf · PDF · 533.2 KB · 17 pages
AI overviewWhat this document contains
This exhibit contains information related to the costs associated with conducting 'As found Meter Tests' for NS Power, including per-test costs and shipping expenses, as well as details about meter readings from AMI meters prior to a cybersecurity event and the removal of a meter for testing. Topics covered include meter testing procedures, costs, and historical meter data.
Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →
Filed in: M12876 — NSPI DRO Appeal - Billing Issues - Greg Hammond
Filing event: RIR on 08/07/2026 · View digest →