103692 Key documents 09/24/2026

Decision Letter

Download original
103692.pdf · PDF · 192.8 KB · 4 pages
AI overviewWhat this document contains

This document is an exhibit from a Nova Scotia Energy Board (NSEB) regulatory matter and contains a decision letter approving a $4,392,251 capital expenditure by Nova Scotia Power Inc. (NS Power) for the refurbishment of Lingan Unit 2 (LIN2) to ensure power system security through the 2025/2026 winter period. It also includes details on the approval of operating expenditures, the transition of reliability functions, and the project's inclusion in the 2025/26 capacity requirement.

Disclaimer: This overview was generated by AI from the filings it describes. We take care to make it accurate, but errors are possible - and it isn't advice. Only the filings themselves are the record: if you're relying on something here, confirm it against the source documents or the Nova Scotia Energy Board's own record. Full disclaimer →

Filed in: M12959 — Nova Scotia Power Inc. - CI C0082195 – LIN2 2025/26 Capacity Requirement - $4,392,251

Filing event: DECISION on 09/24/2026 · View digest →

4 pages
100%
⬇